WhatsApp: +86-18366288508 [email protected]
Get a Free Quote

Custom Metal Building Kits for Commercial and Industrial Projects

Xinguangzheng provides prefabricated metal buildings for warehouses, workshops, aircraft hangars, logistics centers, cold storage facilities, offices, gyms, schools, restaurants, and industrial facilities. Choose from standard sizes or request a custom design for your project.

  • Custom steel structure design and manufacturing
  • Commercial, industrial, and specialty building solutions
  • Standard sizes and fully customized metal building options
  • Quote support for global projects
Prefabricated metal building for industrial use
Metal building design and engineering process at Xinguangzheng

What Is a Metal Building?

A metal building is a prefabricated steel structure assembled from factory-manufactured components — primary rigid frames, secondary members, roof and wall panels, insulation, doors, windows, and accessories. Every component of a prefab metal building is precision-cut, welded, and drilled in a controlled factory environment before shipping to site for bolt-up assembly.

At Xinguangzheng, we manufacture pre-engineered metal buildings using portal frame rigid structures. Our 3 H-beam production lines produce up to 50,000 tonnes per year, with all welds inspected by our 21-member QC team. This is why our component quality pass rate consistently exceeds 99%.

We can achieve column-free spans up to 46 meters as standard, or up to 91 meters with custom truss design — depending on your required span, local wind and snow loads, and whether you need features like overhead cranes or mezzanine floors.

From our engineering team: The most common mistake buyers make is underspecifying local load requirements — particularly wind speed and snow load. Share your project location early so we can reference the correct codes (AISC, Eurocodes, BS) before quoting.

Our Metal Building Engineering Approach

With 40+ design engineers and 120+ total engineering staff, our in-house team handles structural analysis, detail design, and production drawings for every project.

01

Structural System Selection

For spans up to 30m, we recommend portal frames with 6–7.5m column spacing. For workshops with 10T+ bridge cranes, we design stepped columns with reinforced crane beams. For spans exceeding 40m, we use truss or space frame systems.

AISC 360 · EN 1993 · GB 50017
02

Material Specifications

Primary steel: Q345B (= S355JR / A572 Gr.50). Secondary purlins: cold-formed C/Z sections. Cladding: single-layer PPGI (0.5mm), EPS sandwich (50–100mm), PU panels, or rock wool for fire-rated applications.

Q345B · C/Z 200×70×20×2.5
03

Quality Control

H-beams fabricated on automated submerged arc welding lines, then shot blasted. 21 QC inspectors (up to 30 years experience) track every step. Ultrasonic testing (UT) for primary welds. Trial assembly before shipping.

21 QC · 50+ quality staff
50,000T
H-beam / year
3 lines
4,000T
C-section / year
6 lines
3,000T
Z-section / year
1 line
300K m
Sandwich panel / year
3 lines
1.2M m
Steel sheet / year
8 lines

Custom Metal Building Options

Every prefabricated metal building project is different. Customize the steel frame, panels, dimensions, colors, insulation, and accessories to match your requirements.

What Affects Metal Building Cost?

The cost of a prefab steel building depends on multiple factors. For an accurate estimate, submit your project details.

Building Size & Height

Width, length, and eave height directly affect material volume and structural design.

Structural Loads

Wind speed, snow load, seismic zone determine frame design. 150 km/h vs 100 km/h wind can add 15–25% steel weight.

Panel System

Single sheet, sandwich panel, or standing seam. Upgrading to 100mm PU adds $8–15/m².

Insulation & Energy

Climate zone and use determine insulation type, thickness, and energy efficiency requirements.

Doors & Accessories

Sliding doors, roller shutters, cranes, mezzanines can add 10–20% to base structure cost.

Shipping & Installation

Shipping distance, port access, local labor, and site conditions affect total project cost.

Why Choose Xinguangzheng?

Xinguangzheng is a publicly listed steel structure manufacturer (Stock Code: 834422) founded in 1997 in Qingdao. Over 27 years, we have grown to 4 manufacturing facilities, 1,000+ employees, and projects in 130+ countries — including recent shipments of 1,900 tonnes to the United States.

Our 40+ design engineers follow AISC, Eurocodes, BS, and local standards. We dispatch our 30+ person overseas installation team for on-site technical support. Every project passes through structural analysis, detail design, factory fabrication with QC inspection, trial assembly, and export-ready packaging.

Xinguangzheng steel structure factory for custom metal building fabrication
1997
Founded · Listed 2015
1,000+
Employees incl. 40+ design engineers
50,000T
Annual H-beam capacity
130+
Countries served

International Certifications

AISC CWB · CSA W47.1 CE / EN1090 EAC · GOST AS/NZS 1170 ISO 9001 · 14001 · 45001 SGS 50-Year Warranty

Ready to Start Your Metal Building Project?

Share your requirements and our team will provide a custom estimate for your steel building kit.

Get a Custom Metal Building Quote

Frequently Asked Questions

What is a metal building?

A metal building is a prefabricated steel structure assembled from factory-manufactured components — primary rigid frames, secondary members, roof and wall panels, bracing, and accessories. At Xinguangzheng, our 3 H-beam lines produce 50,000T/year. This factory approach typically reduces on-site construction time by 40–60% versus traditional concrete.

What types of metal buildings does Xinguangzheng provide?

Industrial (warehouses, workshops, logistics, breweries, waste management), Commercial (offices, restaurants, schools, medical, shopping malls, car dealerships), and Specialty (hangars, cold storage, gyms, riding arenas, fire stations). Projects delivered to 130+ countries since 1997.

Can metal buildings be customized?

Yes. Our 40+ design engineers adjust span (up to 91m), eave height, column spacing (6/7.5/9m), crane capacity (5T–50T+), insulation (EPS/PU/rock wool 50–150mm), panel profiles, doors, windows, color, mezzanines. We design to AISC, Eurocodes, BS, or local code.

What affects the cost of a metal building?

Key drivers: (1) Size — 1,000 m² warehouse uses 25–35 kg steel/m² vs 20–28 kg/m² at 5,000 m². (2) Wind load — 150 vs 100 km/h adds 15–25% steel. (3) Insulation — single sheet to 100mm PU adds $8–15/m². (4) Accessories — cranes and mezzanines add 10–20%. (5) Shipping distance.

How do I get a quote?

Submit building type, dimensions (W×L×H), location, use, and special requirements. We respond within 24 hours with a preliminary estimate covering structure, cladding, accessories, and FOB shipping. Minimum lead time: 3 weeks. For complex projects, we arrange a video call with engineers before quoting.
Scroll to Top

GET A QUOTE TODAY

ENEnglish